PMP認(rèn)證考試試題精選(3)
申請(qǐng)免費(fèi)試用、咨詢電話:400-8352-114
41. Determining what resources and quantities will be used for the project is part ofA. Cost budgeting
B. Cost estimating
C. Resource planning
D. Cost control
42. The Scope Statement is used in which process
A. Resource Planning
B. Cost Estimating
C. Cost Control
D. Cost Planning
43. Inputs into Resource Planning include:
A. Staffing requirements, procurement policies, Work Breakdown Structure
B. Work Breakdown Structure, Scope Statement, historical information, resource pool description, organizational policies
C. Work Breakdown Structure, Scope definition, resource pool description
D. Expert judgement, historical information, Work Breakdown Structure, Scope Statement
44. The term resource planning refers to:
A. Labor
B. Capital equipment
C. Materials
D. All of the above
45. Cost estimating includes all of the following except:
A. Identifying and considering various costing alternatives
B. Pricing strategy
C. Developing an assessment of the likely quantitative result
D. Baselining
46. Cost Estimating is most closely linked with which other process?
A. Procurement, Risk
B. Scope, Procurement
C. Time, Scope
D. Risk, Time, Integration
47. Parametric Modeling and Analogous Estimating are used in what process:
A. Cost Control Tools and Techniques
B. Cost Estimating Tools and Techniques
C. Risk Analysis Tools and Techniques
D. Risk Analysis Outputs
48. You are building the budget for your project. You dont have detailed requirements for the project yet. However, a fellow project manager completed a similar project A year ago, and has his budget assumptions and final costs documented. You decide to use this information as the basis of your cost estimating. This is called:
A. Analogous estimating
B. Parametric modeling
C. Bottom-up estimating
D. Spreadsheeting
49. As the Project Cost Engineer on a high rise development you are preparing your budget. You have developed a template, based on similar projects that can be used for buildings with 3-25 tories. It breaks out cost per square foot for plumbing, wiring, HVAC, dry wall, floors etc. This type of cost estimating is called:
A. Analogous estimating
B. Parametric modeling
C. Bottom up estimating
D. Spreadsheeting
50. Before you begin the cost budgeting process for building a new school you should make sure your cost engineer has given you:
A. Cost estimates, chart of accounts, cost baseline
B. Supporting detail, estimate at completion
C. Cost estimates and supporting detail,
D. Cost management plan, cost change control plan, cost baseline
本站推薦
- 1PMP項(xiàng)目管理進(jìn)度系統(tǒng),能否讓您的項(xiàng)目一馬當(dāng)先?答案當(dāng)然是肯定的!
- 2項(xiàng)目進(jìn)度管理有難題?PMP系統(tǒng):一問就知,輕松解決
- 3PMP項(xiàng)目管理,項(xiàng)目進(jìn)度管理的疑問終結(jié)者,您還在等什么?
- 4項(xiàng)目進(jìn)度難掌控?PMP管理系統(tǒng):疑問解答,效率倍增!
- 5PMP項(xiàng)目管理進(jìn)度系統(tǒng),能否讓您的項(xiàng)目效率翻倍?答案就在這里!
- 6項(xiàng)目進(jìn)度滯后?PMP管理系統(tǒng):一問就知道怎么加速!
- 7項(xiàng)目管理不再迷茫,PMP進(jìn)度系統(tǒng):您的疑問我來答
- 8PMP在手,項(xiàng)目進(jìn)度管理難題還用問嗎?輕松搞定
- 9還在為項(xiàng)目進(jìn)度頭疼?PMP管理系統(tǒng)幫您一問解千愁!