2010年P(guān)MP美國項目管理考試習(xí)題及答案六十七
QUEST The Risk of NOT meeting project quality objectives:
A can be minimized through continuous monitoring.
B considered a long term risk.
C will be reflected in the "in-service" life of the product or service.
D B and C
E All of the above.
參考答案:E
QUEST The "zero defect" concept was proposed by:
A Deming
B Juran
C Crosby
D Tagushi
E A and D only
參考答案:C
QUEST The use of quality circles:
A has proven ineffective in both Japan and the U.S.
B is particularly effective in overcoming labor/management conflicts.
C provides a quick fix for most quality problems.
D allows workers the opportunity to generate solutions for chronic quality problems.
E A and B only
參考答案:D
QUEST In a flowchart, the diamond form is used to represent:
A a starting point.
B an operation.
C a written report.
D a decision point.
E an end point.
參考答案:D
QUEST In a fishbone diagram, the effect you are concerned about is placed:
A at the right-hand end of the spine.
B at the end of the diagonal line (i.e. "fin").
C on a branch of a fin.
D at the left-hand end of the spine.
E None of the above.
參考答案:A