PMP認(rèn)證考試練習(xí)題(十九)(中英文)
申請(qǐng)免費(fèi)試用、咨詢(xún)電話:400-8352-114
1. The highest attainable point in Maslow’s hierarchical diagram of needs is:
Basic, or physiological
Esteem
Team acceptance
Self actualization
在馬斯洛Maslow需要層次圖中,最高可達(dá)成點(diǎn)是:
a. 基本的或生理上的
b. 自尊
c. 團(tuán)隊(duì)承認(rèn)
d. 自我的實(shí)現(xiàn)
2. Which of the following personality attributes is not desired in a project manager?
Aversion to problem situations
Reliance on the team to resolve many of their own conflicts
Understanding of the project technology
Understanding of personnel problems
下列哪一項(xiàng)個(gè)人特質(zhì)不期望在一個(gè)項(xiàng)目經(jīng)理身上看到?
厭惡出現(xiàn)問(wèn)題
依賴(lài)團(tuán)隊(duì)來(lái)解決自己的很多沖突
理解項(xiàng)目技術(shù)
理解人事問(wèn)題
3. Once Mike had completed the organizational planning for his project, he could successfully present which of the following to his sponsor?
Work breakdown structure, project plan, resource plan
Roles and responsibilities, risk plan, quality plan
Role and responsibility assignments, staffing management plan, project organization
chart
Project charter, project organization chart, roles and responsibilities, staffing plan
當(dāng)麥克Mike完成了其項(xiàng)目的組織規(guī)劃, 他就能成功地向其業(yè)主呈現(xiàn)下列哪些事項(xiàng)?
工作分解結(jié)構(gòu), 項(xiàng)目計(jì)劃, 資源計(jì)劃
角色和責(zé)任,風(fēng)險(xiǎn)計(jì)劃, 質(zhì)量計(jì)劃
角色和責(zé)任安排, 員工配置管理計(jì)劃, 項(xiàng)目組織圖
項(xiàng)目章程,項(xiàng)目組織圖,角色和責(zé)任, 員工配置計(jì)劃
4. Consider a project where core personnel from the functional areas are assigned to the project on a full-time basis, and the functional managers have no formal involvement. This situation describes an example of a:
Project matrix
Unbalance matrix
Non-functional organization
Project team
如果在一個(gè)項(xiàng)目中,來(lái)自職能領(lǐng)域的核心員工被安排專(zhuān)職做項(xiàng)目,但是職能經(jīng)理并沒(méi)有正式參與. 這種情形描述著一個(gè)什么例子:
項(xiàng)目矩陣
非平衡矩陣
非職能性組織
項(xiàng)目團(tuán)隊(duì)
5. You and your project team decide to use three time estimates per task to estimate durations. Your team is probably utilizing:
The PDM method
The PERT method
AWBS
CPM
你和你的項(xiàng)目團(tuán)隊(duì)決定對(duì)每項(xiàng)工作使用三次估計(jì)來(lái)估算工時(shí). 你的團(tuán)隊(duì)可能在利用:
優(yōu)先圖示法PDM
計(jì)劃評(píng)審技術(shù)PERT法
實(shí)際工作分解結(jié)構(gòu)AWBS
關(guān)鍵路線法CPM
6. Precedence Diagram Method (PDM) differs from Arrow Diagramming Method (ADM) primarily by allowing to represent .
Arrows, activity time durations
Nodes/boxes, events
Nodes/boxes, activities or work
Constraints, slack time
優(yōu)先圖示法 (PDM) 與箭線圖示法 (ADM) 的主要區(qū)別在于通過(guò)用 來(lái)表示 .
箭線, 活動(dòng)持續(xù)時(shí)間
節(jié)點(diǎn)/方框, 事件
節(jié)點(diǎn)/方框,活動(dòng)或工作
限制因素, 機(jī)動(dòng)時(shí)間
7. The starting point in the development of a top-down CPM chart is the .
Project specification tree
Customer’s deliverable list
Customer’s milestone dates
Work Breakdown Structure
在制定自上而下的關(guān)鍵路線法CPM圖的起點(diǎn)是 .
項(xiàng)目規(guī)格樹(shù)
客戶(hù)的交付物目錄表
客戶(hù)的里程碑日期
工作分解結(jié)構(gòu)
本站推薦
- 1PMP項(xiàng)目管理進(jìn)度系統(tǒng),能否讓您的項(xiàng)目一馬當(dāng)先?答案當(dāng)然是肯定的!
- 2項(xiàng)目進(jìn)度管理有難題?PMP系統(tǒng):一問(wèn)就知,輕松解決
- 3PMP項(xiàng)目管理,項(xiàng)目進(jìn)度管理的疑問(wèn)終結(jié)者,您還在等什么?
- 4項(xiàng)目進(jìn)度難掌控?PMP管理系統(tǒng):疑問(wèn)解答,效率倍增!
- 5PMP項(xiàng)目管理進(jìn)度系統(tǒng),能否讓您的項(xiàng)目效率翻倍?答案就在這里!
- 6項(xiàng)目進(jìn)度滯后?PMP管理系統(tǒng):一問(wèn)就知道怎么加速!
- 7項(xiàng)目管理不再迷茫,PMP進(jìn)度系統(tǒng):您的疑問(wèn)我來(lái)答
- 8PMP在手,項(xiàng)目進(jìn)度管理難題還用問(wèn)嗎?輕松搞定
- 9還在為項(xiàng)目進(jìn)度頭疼?PMP管理系統(tǒng)幫您一問(wèn)解千愁!