PMP認(rèn)證考試練習(xí)題(十一)(中英文)
1. A door panel for a new car is inspected prior to installation on the automobile. This is an example of:
Prevention
Variable Sampling
Quality Assurance
Quality Control
新汽車的儀表盤在安裝前已經(jīng)被檢驗(yàn). 這是下列那一種的例子:
預(yù)防
可變樣本
質(zhì)量保證
質(zhì)量控制
2. A thunderstorm caused intermittent power outages during a 24-hour period. When the day’s production run was sampled it was found that over 50% of the products produced were defective. These defects are an example of :
Variable sampling
Special causes
Prevention
Inspection
Random causes
一場雷暴造成24小時(shí)的停電. 白天生產(chǎn)的產(chǎn)品被發(fā)現(xiàn)有50%的不合格. 此種不合格是下列那一個(gè)的例子:
可變樣本
特殊原因
預(yù)防性
檢查
隨即原因
3. A:PM wanted to show management ,visually, how quality controls were affecting processes. the best tool to accomplish this is :
diagrams
Histograms
Flowcharts
Control charts
Statistical samples
項(xiàng)目經(jīng)理想向管理層顯示可視的質(zhì)量控制對過程的影響. 完成它最好的工具是:
Pareto 圖
柱狀圖
流程圖
控制圖
統(tǒng)計(jì)樣本
4. A PM is developing the projects budget and wants to have adequate resources to implement a solid quality control program. His project will cost approximately $110.00.What is the minimum amount he should include in the project budget for the quality program?
$10,000
$7,500
$6,135
$3,300
$5,500
一個(gè)項(xiàng)目經(jīng)理正項(xiàng)目預(yù)算同時(shí)想使用適當(dāng)?shù)馁Y源完成穩(wěn)固的質(zhì)量控制程序. 它的項(xiàng)目成本大約是$110.00,他應(yīng)當(dāng)在項(xiàng)目預(yù)算中對質(zhì)量的預(yù)算最少做多少?
$10,000
$7,500
$6,135
$3,300
$5,500
5. Repeating the initiating processes at the beginning of each phase to keep the project focused on:
Interaction between phases.
The details of the project using rolling wave planning
Process group overlapping within each phase.
Business needs.
在每一階段初期重復(fù)立項(xiàng)過程以保證項(xiàng)目著重于:
階段間的交互
項(xiàng)目運(yùn)用滾動(dòng)波浪計(jì)劃的細(xì)節(jié)
在每一階段工藝組有重疊
商業(yè)需要
6. In the integration management process, the project development uses the outputs of the other planning processes to create a consistent, coherent document that can be used to guide both project______
Execution, control
Control, termination
Scope management, integration
Initiation and close-out.
在綜合管理程序中,項(xiàng)目開展使用其他計(jì)劃過程的輸出以形成一個(gè)持續(xù)的,連貫的文件以便用于同時(shí)指導(dǎo)項(xiàng)目的___.
實(shí)施,控制
控制, 終止
范圍管理,綜合
立項(xiàng),收尾
7. Of the PMBOKTM’s five project management process groups, which group is a common thread that spans the majority of these processes from the start to finish?
Executing
Planning
Controlling
Initiating
Closing
PMBOKTM’s的五個(gè)項(xiàng)目管理過程組中,哪一個(gè)過程組由始至終作為共同的線索跨越了絕大多數(shù)的過程?
實(shí)施
計(jì)劃
控制
立項(xiàng)
收尾
本站推薦
- 1PMP項(xiàng)目管理進(jìn)度系統(tǒng),能否讓您的項(xiàng)目一馬當(dāng)先?答案當(dāng)然是肯定的!
- 2項(xiàng)目進(jìn)度管理有難題?PMP系統(tǒng):一問就知,輕松解決
- 3PMP項(xiàng)目管理,項(xiàng)目進(jìn)度管理的疑問終結(jié)者,您還在等什么?
- 4項(xiàng)目進(jìn)度難掌控?PMP管理系統(tǒng):疑問解答,效率倍增!
- 5PMP項(xiàng)目管理進(jìn)度系統(tǒng),能否讓您的項(xiàng)目效率翻倍?答案就在這里!
- 6項(xiàng)目進(jìn)度滯后?PMP管理系統(tǒng):一問就知道怎么加速!
- 7項(xiàng)目管理不再迷茫,PMP進(jìn)度系統(tǒng):您的疑問我來答
- 8PMP在手,項(xiàng)目進(jìn)度管理難題還用問嗎?輕松搞定
- 9還在為項(xiàng)目進(jìn)度頭疼?PMP管理系統(tǒng)幫您一問解千愁!