1 The capacity to get an individual or group to perform a given task is described as:A Authority
B Power
C Influence
D Leadership
E Motivation
ans:E
2 A project manager believes that the best way to manage is to form a good, harmonious working relationship with the team, and high performance will follow. The project manager could be defined as a _____ manager.
A 1,9
B 9,1
C 1,1
D 9,9
E 5,5
ans:A
3 Project leadership requires that the project manager pay attention simultaneously to the:
A Tasks to be performed and needs of the team
B Quantity and quality of the work to be performed 考試大(www.Examda。com)
C Efficiency and effectiveness of the team
D Time, cost and performance deliverables
E All of the above
ans:E
4 Which of the following can the project manager use as a means of measuring project team effectiveness?
A Absenteeism
B Sponsor-approved salary increases
C Efficiency of the team
D Turnover of personnel
E Grievances
ans:C
5 Most project management leadership theories focus on all of the following except:
A Personal characteristics of the project manager
B The situation at hand
C Personal traits of the subordinates
D Behavioral styles of the project manager
E Usefulness of authority and power in leadership
ans:C
6 Which theory(s) prescribes a form of participative management?
A theory X
B theory Y
C theory Z
D A or B
E B or C
ans:B
7 In which of the following organization(s) does the Functional Manager have the LEAST authority?
A coordinator
B weak matrix
C strong matrix
D functional
E expediter
ans:C
8 Project team building is most difficult in which type of environment?
A weak matrix organization
B strong matrix organization
C projectized organization www.Examda.CoM
D functional organization
E expediter organization
ans:A
9 The core function of the PM is
A client interfacing
B project integration
C quality assurance
D personal administration
E All of the above.
ans:B
10 Which of the following is based on an individual identification with a more powerful person.
A expert power
B reward power
C referent power
D A and B.
E A and C
ans:C
11 Which of the following results are Win/Win conflict resolution?
A compromising
B forcing
C problem solving
D smoothly
E withdraw
ans:C
12 Which of the following organizations has the best technical project control?
A matrix
B functional
C projectized
D B and C
E A and B
ans:D
本站推薦
- 1PMP項(xiàng)目管理進(jìn)度系統(tǒng),能否讓您的項(xiàng)目一馬當(dāng)先?答案當(dāng)然是肯定的!
- 2項(xiàng)目進(jìn)度管理有難題?PMP系統(tǒng):一問就知,輕松解決
- 3PMP項(xiàng)目管理,項(xiàng)目進(jìn)度管理的疑問終結(jié)者,您還在等什么?
- 4項(xiàng)目進(jìn)度難掌控?PMP管理系統(tǒng):疑問解答,效率倍增!
- 5PMP項(xiàng)目管理進(jìn)度系統(tǒng),能否讓您的項(xiàng)目效率翻倍?答案就在這里!
- 6項(xiàng)目進(jìn)度滯后?PMP管理系統(tǒng):一問就知道怎么加速!
- 7項(xiàng)目管理不再迷茫,PMP進(jìn)度系統(tǒng):您的疑問我來答
- 8PMP在手,項(xiàng)目進(jìn)度管理難題還用問嗎?輕松搞定
- 9還在為項(xiàng)目進(jìn)度頭疼?PMP管理系統(tǒng)幫您一問解千愁!