成都公司:成都市成華區(qū)建設(shè)南路160號(hào)1層9號(hào)
重慶公司:重慶市江北區(qū)紅旗河溝華創(chuàng)商務(wù)大廈18樓
當(dāng)前位置:工程項(xiàng)目OA系統(tǒng) > 建筑OA系統(tǒng) > 軟件項(xiàng)目管理工具
PMP認(rèn)證考試練習(xí)題及參考答案(十五)
申請(qǐng)免費(fèi)試用、咨詢電話:400-8352-114
1. things that distort, distract, or muddle the communication process are called:
a. noise
b. selective filtering
c. selective perception
d. medium problems
e. all of the above.http://ks.examda.com
ans: a
2. which is not a consideration in a make or buy decision?
a. cost factors (least cost alternatives)
b. competitors' method of sourcing
c. existence of sufficient administration/technical personnel
d. political and social factors
e. none of the above.
ans: b
3. a work breakdown structure:
a. assures all work is identified
b. subdivides the project into manageable segments
c. provides the project sponsor with a time-phase task summary
d. both a and b
e. all of the above.來(lái)源:考試大
ans: d
4. a project manager can exchange information with the project team using which media?
a. tactile
b. audio
c. olfactory
d. visual
e. all of the above.
ans: e
5. during project execution, the customer authorizes and funds a scope change which requires a major change in the schedule. the baseline
schedule:
a. now becomes the new schedule, including the changes, and the original baseline is disregarded.
b. is still the original baseline but annotated to reflect that a change has taken place.
c. is amended to reflect the scope change, but the original baseline is still maintained for post-project review.
d. is meaningless since every schedule update changes the baseline (i.e., a rubber baseline.)
e. is the same since baseline schedules cannot change once the development phase is completed.
ans: c
6. sensitivity analysis can be used in risk analysis to:
a. substitute for uncertainty analysis in risk quantification
b. estimate the level of risk aversion adopted by management
c. estimate the effect of change of one project variable on the overall project
d. a and b
e. all of the above.來(lái)源:www.examda.com
ans: c
7. the pareto principle is a technique used by quality managers to determine which quality control problems of a particular service or
manufacturing process should be corrected. which of the following statements represents the philosophy of the principle?
a. in order to minimize financial losses from quality control problems, all problems which have a measurable cost associated with them should be
corrected.
b. the majority of defects are caused by a small percentage of the identifiable problems. improvements efforts should be reserved for these vital
few problems.
c. in order to achieve zero defects, all quality control problems, including those which do not have a direct financial cost should be corrected.
d. generally, 80 % of the quality control problems are justifiable for correction via cost-benefit analysis. the remaining 20% are not financially
worthy of improvement efforts.
e. a and d
ans: b
8. the budgeted cost of the work performed (bcwp) for a task that has just been completed can be calculated by:
a. multiplying the actual hours worked on the project by the budgeted labor rate.
b. multiplying the budgeted hours to complete the task by the budgeted labor rate.
c. dividing the actual hours required to complete the task by the budgeted labor rate.
d. cannot be determined.
e. none of the above來(lái)源:考試大
ans: b
9. the project manager has, as a prime responsibility, to assure proper integration of activities. in which organizational form does the project
manager probably have the easiest time in integrating work?
a. matrix
b. classical
c. expediter
d. coordinator
e. pure project
ans: e
10. there are four methods of government procurement. which is not one of these methods?
a. assistance
b. sealed bidding
c. competitive proposals
d. acquisition考試大(www.Examda。com)
e. small purchases
ans: d
11. a scientist is informing techs. about a new product which is starting and the type of work that the lab techs. will be expected to do. the
barriers which could hinder the lab techs. ability to filter the information include all of the following except:
a. language and semantics
b. culture and ethics
c. intelligence and knowledge base
d. reputation, authority, organizational status and position
e. relative location of the lab to the scientist's office
ans: e
12. many companies self insure against some risk. problems which can arise from self-insurance include:
a. failure to reserve funds to handle worst case scenarios (low probability events) resulting in severe financial damage to the company
b. stiff competition from insurance companies
c. confusion of business risks with insurable risks.
d. a and c
e. all of the above.
ans: d
本站推薦
- 1PMP項(xiàng)目管理進(jìn)度系統(tǒng),能否讓您的項(xiàng)目一馬當(dāng)先?答案當(dāng)然是肯定的!
- 2項(xiàng)目進(jìn)度管理有難題?PMP系統(tǒng):一問(wèn)就知,輕松解決
- 3PMP項(xiàng)目管理,項(xiàng)目進(jìn)度管理的疑問(wèn)終結(jié)者,您還在等什么?
- 4項(xiàng)目進(jìn)度難掌控?PMP管理系統(tǒng):疑問(wèn)解答,效率倍增!
- 5PMP項(xiàng)目管理進(jìn)度系統(tǒng),能否讓您的項(xiàng)目效率翻倍?答案就在這里!
- 6項(xiàng)目進(jìn)度滯后?PMP管理系統(tǒng):一問(wèn)就知道怎么加速!
- 7項(xiàng)目管理不再迷茫,PMP進(jìn)度系統(tǒng):您的疑問(wèn)我來(lái)答
- 8PMP在手,項(xiàng)目進(jìn)度管理難題還用問(wèn)嗎?輕松搞定
- 9還在為項(xiàng)目進(jìn)度頭疼?PMP管理系統(tǒng)幫您一問(wèn)解千愁!