2010年P(guān)MP美國項目管理考試習(xí)題及答案15
QUEST The Utility Theory _____ .
A considers risk propensity of the decision maker.
B attempts to formalize management's risk considerations.
C works well with decision tree analysis.
D is considered highly theoretical.
E All of the above.
參考答案:B
QUEST The Quality Risk _____ .
A is minimized through continuous monitoring.
B is considered a long term risk.
C will be reflected in the in-service life of the project result.
D B and C
E All of the above.
參考答案:E
QUEST Using the figure in the Special Window, what is the probability of success for Project B?
A 0.3
B 0.2
C 0.35
D 0.15
E 0.12
參考答案:C
QUEST Using the diagram in the Special window, what is the probability that Alternative I will be adopted and completed below budget:
A 1.4
B 0.8
C 0.2
D 0.12
E None of the above
參考答案:D
QUEST Using the possible loss outcomes shown in the Special window, find the expected (loss)
A ¥0
B ¥-1,300
C ¥-2,000
D ¥-3,000
E None of the above