PMP認(rèn)證考試練習(xí)題及參考答案(四十)
A the use of quality circles.
B small, continuous improvements in quality control.
C the use of worker suggestion systems.
D the use of quality control charts. 來源:www.examda.com
E focusing quality control efforts on production outputs.
ans:E
2 Control chart theory is based on the differentiation of the causes of variations in quality. Variations may be produced by assignable causes. All of the following are examples of assignable causes except:
A differences among machines.
B differences among workers.
C differences among materials.
D differences in each of these factors over time.
E None of the above (all are examples)
ans:E
3 The rule of seven used by quality control engineers states that if a run of seven or more samples lays on one side of the process mean, then the process is out of control. What is the probability that this condition is the result of random variations.
A 14.30%
B 3.12%
C 2.73% www.Examda.CoM
D 1.56%
E 0.78%
ans:D
4 Two sources of variation in the length of hex bolts exist. Production variation and measurement error. The QC manager knows that the standard deviation from these sources is 0.24" and 0.43" , respectively. What is the total standard deviation.
A .10 inch.
B .19 inch.
C .34 inch.
D .49 inch.
E .67 inch.
ans:D
5 Affinity diagrams are used to:
A determine if a process is in control.
B determine root cause.
C show the relationship among variables.
D categorize large amounts of data.
E None of the above.
ans:D
6 Which quality management tool would be used to determine potential causes of a production problem?
A control chart.
B Ishikawa diagram.
C scatter diagram.
D histogram. 來源:www.examda.com
E run chart.
ans:B
7 Which of the following is not an input to quality planning?
A scope statement.
B regulations.
C work results.
D standards.
E quality policy.
ans:C
8 To determine what causes the majority of quality problems in a process, a very useful tool is the:
A cause and effect diagrams.
B flow chart.
C control chart.
D pareto chart.
E trend chart.
ans:D
9 For a given characteristic in a construction process, the standard deviation associated with production variation is 0.8", and the standard deviation associated with measurement variation is 0.6". The total standard deviation for this characteristic is:
A 1.4"
B 1.2".
C 1.0"
D 0.8"
E 0.2"
ans:C
10 Assignable cause or special variation is:
A is indicated when a point falls outside the control limits.
B is indicated when a point falls outside the specification limits.
C is indicated when a run of seven or more points fall above the center line of a standard control chart.
D is indicated when a run of seven or more points fall below the center line of a standard control chart.
E A, C, and D.
ans:E www.Examda.CoM
11 Quality control charts show a characteristic of the product or service against:
A the specification limits.
B customer requirements.
C control limits based on three standard deviations in each direction.
D control limits based on six standard deviations in each direction.
E A and D only
ans:C
12 Which of the following constitute Juran's "quality trilogy":
A planning, inspection, control.
B planning, improvement, control.
C planning, organization, control.
D product, price, customer.
E design, build, deliver.
ans:B
本站推薦
- 1PMP項目管理進(jìn)度系統(tǒng),能否讓您的項目一馬當(dāng)先?答案當(dāng)然是肯定的!
- 2項目進(jìn)度管理有難題?PMP系統(tǒng):一問就知,輕松解決
- 3PMP項目管理,項目進(jìn)度管理的疑問終結(jié)者,您還在等什么?
- 4項目進(jìn)度難掌控?PMP管理系統(tǒng):疑問解答,效率倍增!
- 5PMP項目管理進(jìn)度系統(tǒng),能否讓您的項目效率翻倍?答案就在這里!
- 6項目進(jìn)度滯后?PMP管理系統(tǒng):一問就知道怎么加速!
- 7項目管理不再迷茫,PMP進(jìn)度系統(tǒng):您的疑問我來答
- 8PMP在手,項目進(jìn)度管理難題還用問嗎?輕松搞定
- 9還在為項目進(jìn)度頭疼?PMP管理系統(tǒng)幫您一問解千愁!