2010年P(guān)MP美國(guó)項(xiàng)目管理考試習(xí)題及答案七十
申請(qǐng)免費(fèi)試用、咨詢電話:400-8352-114
QUEST Affinity diagrams are used to:
A determine if a process is in control.
B determine root cause.
C show the relationship among variables.
D categorize large amounts of data.
E None of the above.
參考答案:D
QUEST Which quality management tool would be used to determine potential causes of a production problem?
A control chart.
B Ishikawa diagram.
C scatter diagram.
D histogram.
E run chart.
參考答案:B
QUEST Which of the following is not an input to quality planning?
A scope statement.
B regulations.
C work results.
D standards.
E quality policy.
參考答案:C
QUEST To determine what causes the majority of quality problems in a process, a very useful tool is the:
A cause and effect diagrams.
B flow chart.
C control chart.
D pareto chart.
E trend chart.
參考答案:D
QUEST For a given characteristic in a construction process, the standard deviation associated with production variation is 0.8", and the standard deviation associated with measurement variation is 0.6". The total standard deviation for this characteristic is:
A 1.4"
B 1.2".
C 1.0"
D 0.8"
E 0.2"
參考答案:C
相關(guān)試題:
2010年P(guān)MP美國(guó)項(xiàng)目管理考試習(xí)題及答案六十九
試題推薦:
2010年P(guān)MP美國(guó)項(xiàng)目管理認(rèn)定考試全真模擬試題精選1
2010年P(guān)MP美國(guó)項(xiàng)目管理認(rèn)定考試全真模擬試題精選2
2010年P(guān)MP美國(guó)項(xiàng)目管理認(rèn)定考試全真模擬試題精選3
本站推薦
- 1高速公路項(xiàng)目部2010年度業(yè)務(wù)代表述職報(bào)告
- 2廣西六欽高速某標(biāo)段2010年度施工進(jìn)度計(jì)劃
- 3貴新高速公路粗苯泄漏的應(yīng)急監(jiān)測(cè)
- 4交通部試驗(yàn)檢測(cè)師:交通安全設(shè)施測(cè)試題(2010年度)
- 5交通部試驗(yàn)檢測(cè)工程師:橋涵工程試驗(yàn)檢測(cè)試題(2010年度)
- 62010年公路工程試驗(yàn)檢測(cè)師考試復(fù)習(xí)資料
- 7交通部試驗(yàn)檢測(cè)師:公路、材料測(cè)試題(2010年度)
- 82010年一級(jí)建造師考試模擬題及復(fù)習(xí)大綱
- 92010年全國(guó)一級(jí)建造師執(zhí)業(yè)資格考試模擬試題(含答案)