2010年P(guān)MP美國(guó)項(xiàng)目管理考試習(xí)題及答案四十八
申請(qǐng)免費(fèi)試用、咨詢電話:400-8352-114
QUEST Which of the following is considered a direct cost for producing a widget?
A The cost of the materials used to produce a widget.
B The labor costs of the workers who actually produced the widget.
C The rent for the building in which the widget was manufactured
D The salary of senior management and the project sponsor
E A and B only
參考答案:E
QUEST The reason that cost management is so difficult in project management is that:
A Projects by definition and nature are non-recurring events and are therefore difficult to predict.
B There are no tools for identifying project tasks.
C Project managers do not care about tracking costs, as only schedules are important to all project managers.
D A and B only
E B and C only
參考答案:A
QUEST Upon completion of 75% of the project, the original schedules and cost estimates that were submitted at the inception of the project are referred to as the:
A Baseline costs
B Budgeted costs.
C Estimates upon completion costs
D Scheduled costs
E None of the above
參考答案:A
QUEST The difference between the BCWS and the BCWP is referred to as the:
A Schedule variance
B Cost variance.
C Estimate of completion
D Actual cost of the work performed
E None of the above
參考答案:A
QUEST When a project manager is running over the budgeted costs, the project manager can typically _____ to attempt to get the project back on budget.
A Reduce features and/or functionality
B Increase risk.
C Incur a schedule slippage (to obtain more favorable pricing due to lengthened delivery times)
D All of the above.
E A and B only
參考答案:D
相關(guān)試題:
2010年P(guān)MP美國(guó)項(xiàng)目管理考試習(xí)題及答案四十七
試題推薦:
2010年P(guān)MP美國(guó)項(xiàng)目管理認(rèn)定考試全真模擬試題精選1
2010年P(guān)MP美國(guó)項(xiàng)目管理認(rèn)定考試全真模擬試題精選2
2010年P(guān)MP美國(guó)項(xiàng)目管理認(rèn)定考試全真模擬試題精選3
本站推薦
- 1高速公路項(xiàng)目部2010年度業(yè)務(wù)代表述職報(bào)告
- 2廣西六欽高速某標(biāo)段2010年度施工進(jìn)度計(jì)劃
- 3貴新高速公路粗苯泄漏的應(yīng)急監(jiān)測(cè)
- 4交通部試驗(yàn)檢測(cè)師:交通安全設(shè)施測(cè)試題(2010年度)
- 5交通部試驗(yàn)檢測(cè)工程師:橋涵工程試驗(yàn)檢測(cè)試題(2010年度)
- 62010年公路工程試驗(yàn)檢測(cè)師考試復(fù)習(xí)資料
- 7交通部試驗(yàn)檢測(cè)師:公路、材料測(cè)試題(2010年度)
- 82010年一級(jí)建造師考試模擬題及復(fù)習(xí)大綱
- 92010年全國(guó)一級(jí)建造師執(zhí)業(yè)資格考試模擬試題(含答案)