2010年P(guān)MP美國項(xiàng)目管理考試習(xí)題及答案五十三
申請(qǐng)免費(fèi)試用、咨詢電話:400-8352-114
QUEST Using the situation stated in the Special window, WBS Element Q is _____ budget by _____ percent.
A Over, 16.66
B Under, 16.66
C Over, 10.0
D Under, 10.0
E None of the above.
參考答案:A
QUEST Using the situation stated in the Special window, the schedule performance index (SPI) for WBS Element P is:
A 1.1
B 0.9
C 0.956
D 1.15
E 0.869
參考答案:A
QUEST Using the situation stated in the Special window, the cost performance index (CPI) for WBS Element R is:
A 0.875
B 1.14
C 0.952
D 0.833
E 1.2
參考答案:B
QUEST Using the situation stated in the Special window, which WBS element has a favorable cost variance of $150?
A Element P
B Element Q
C Element R
D Element S
E None of the above.
參考答案:C
QUEST Using the situation stated in the Special window, which WBS element is behind schedule but under budget?
A Element P
B Element Q
C Element R
D Element S
E None of the above.
參考答案:D
相關(guān)試題:
2010年P(guān)MP美國項(xiàng)目管理考試習(xí)題及答案五十二
試題推薦:
2010年P(guān)MP美國項(xiàng)目管理認(rèn)定考試全真模擬試題精選1
2010年P(guān)MP美國項(xiàng)目管理認(rèn)定考試全真模擬試題精選2
2010年P(guān)MP美國項(xiàng)目管理認(rèn)定考試全真模擬試題精選3
本站推薦
- 1高速公路項(xiàng)目部2010年度業(yè)務(wù)代表述職報(bào)告
- 2廣西六欽高速某標(biāo)段2010年度施工進(jìn)度計(jì)劃
- 3貴新高速公路粗苯泄漏的應(yīng)急監(jiān)測(cè)
- 4交通部試驗(yàn)檢測(cè)師:交通安全設(shè)施測(cè)試題(2010年度)
- 5交通部試驗(yàn)檢測(cè)工程師:橋涵工程試驗(yàn)檢測(cè)試題(2010年度)
- 62010年公路工程試驗(yàn)檢測(cè)師考試復(fù)習(xí)資料
- 7交通部試驗(yàn)檢測(cè)師:公路、材料測(cè)試題(2010年度)
- 82010年一級(jí)建造師考試模擬題及復(fù)習(xí)大綱
- 92010年全國一級(jí)建造師執(zhí)業(yè)資格考試模擬試題(含答案)