2010年P(guān)MP美國項目管理考試習題及答案十二
QUEST Selection criteria for project selection include:
A cost versus benefit
B risk
C contribution towards organizational goals
D rate of return
E All of the above.
參考答案:E
QUEST The purpose of configuration management is to:
A insure drawings are updated
B control change throughout the project
C control change during the production only
D generate engineering change proposals
E inform the project manager of changes
參考答案:B
QUEST A work breakdown structure is most useful for:
A identifying individual tasks for a project
B scheduling the start of tasks
C developing a cost estimate
D determining potential delays
E A and C
參考答案:E
QUEST A Gantt chart is useful in determining:
A the level of effort for a task
B when a task starts and stops
C how tasks are related to each other
D who is assigned to do a task
E All of the above.
參考答案:B
QUEST A technical requirement has which of the following characteristics:
A easy to understand
B a communication tool between the user and the design team
C written in non-technical language
D developed in cooperation with the user
E typically describe physical dimensions and performance requirements
參考答案:E